In-house Professional Engineering

Building Information Modelling (BIM)

One of the many critical offerings that set CWL Group apart from any other design and construct geothermal exchange organisation in the country, is our in-house engineering team’s intensive application of Building Information Modelling (BIM) utilising Autodesk Revit.

BIM is indispensable for accurate HVAC design and construction due to its ability to revolutionise the planning, visualisation, and execution of complex building projects, as BIM enables the creation of highly detailed and precise 3D models that encapsulate every facet of a building’s HVAC system. This comprehensive visualisation allows engineers and designers to foresee and resolve potential conflicts, or “clashes”, before they materialise on-site, significantly reducing costly errors and rework.

Moreover, BIM fosters enhanced collaboration among all stakeholders, including architects, engineers, and contractors. By providing a unified platform for information sharing and real-time updates, BIM ensures that everyone involved in the project is on the same page, thereby minimising miscommunications and project delays. This collaborative environment is essential for the intricate coordination required in the design of mechanical systems, where even minor misalignments can lead to significant inefficiencies and performance issues.

Essentially, BIM enables CWL Group to:

  1. Strategically design our systems to seamlessly integrate into spaces otherwise not possible with a traditional “trial and error” approach on-site;
  2. Virtually collaborate with other trades to ensure the best outcome for the client, as opposed to the conventional “first in, best dressed” tactic in which trades just attempt to claim space by getting their scope installed first, and leaving later trades to compromise their installations to adapt to whatever limited space remains;
  3. Visually demonstrate to architects and end-users what our system will look like prior to us ever setting foot on-site, and often enabling the re-claiming of space previously allocated for the HVAC system; and
  4. Methodically provide our installation team with a set of “for construction” plans so thorough and detailed, they are able to install the mechanical components at a level of efficiency otherwise unattainable, and with little variation between the design and final result.

CWL Group’s use of BIM’s ability to provide detailed visualisation, foster collaboration, and systemise execution makes it critical for the accurate HVAC design and construction. CWL Group’s adoption of BIM is not just about staying current with technology; it’s about ensuring the success, efficiency, and sustainability of our geothermal exchange projects in an increasingly complex and demanding construction landscape.

Our Trusted Partners

We wanted to drop you a line to say thank you for your expertise and professionalism during our geo journey. Your patience and outstanding knowledge were visible along the way and greatly appreciated. Congratulations in assembling a team who have all been of the same high standard. It has been a pleasure to deal with all of you.
- Jenine Cranston and Douglas Fone, Artarmon, Sydney
We engaged CWL for the geothermal exchange and HVAC works on our unique project in Bellevue Hill and were selected based on pricing and their previous experience. It turned out to be the best choice in subcontractors we made for the whole project. Their professionalism, work ethic, expertise and willing to help wherever needed made a highly complex services installation that much easier, and more efficient than expected. I’d like to personally thank James and the site team who put the extra effort in at all times to get our project over the line with remarkable results. Highly recommended Subcontractors and mechanical consultants.
- Theo Elphick, Site Manager, Built
A culture of striving for excellence combined with motivated and dedicated staff is what defines CWL Group. Their workmanship is second to none and it is obvious that all of the staff care about what they do. Commitments are met and exceeded and there are no problems that can’t be resolved. I’m looking forward to working with Clayton and his team in the future and have no hesitation in recommending them to anyone.
- Mick Carroll, Bellevarde Constructions
The team from CWL Group are very reliable, responsive and efficient in their work. They go above and beyond to make sure the job is completed at its highest standard. The knowledge of the guys is exceptional. I would recommend the CWL Group team every time!
- Annemarie Rodrigo, Bellevue Hill House Keeper
I want to thank CWL Group for the outstanding work in installing our hydronic heating system. I have worked with many plumbers over the years and I have never seen such a high standard of workmanship. They came in on time and on budget. I cannot recommend the team from CWL Group highly enough.
- Robert & Roberta Cook, Blue Mountains

Service that goes above,
beyond and… below

Contact us